Today, I will talk about the preparation work before the installation of the dense bus duct in Suzhou. As we all know, the technology of the dense bus duct in Suzhou has received extensive attention from the industry.
The so-called "workers who want to do well must first sharpen their tools", this is the precious life wealth left to us by our ancestors. When we do things, we must prepare relevant information in advance, and when we use tools, we must first provide him with relevant motivation, so that we can get twice the result with half the effort. It is the same no matter where it is. In fact, the same is true for the dense bus duct in Suzhou. People often think that the quality and high price of the dense bus duct in Suzhou will be very good. In fact, this is wrong. Often when installing the dense bus duct in Suzhou, If you don't pay attention to it, the use capacity of Suzhou's dense bus duct will be greatly reduced.
1. Technical clarification
On-site construction technicians should thoroughly understand the construction drawings before construction, and master the relevant technical standards and the requirements of the Suzhou intensive bus duct installation specifications. The technicians should combine the Suzhou intensive bus duct structure and installation instructions to make technical explanations to all on-site construction personnel .
2. Suzhou dense busway direction measurement
After the civil decoration construction is completed and the electrical equipment is in place, the Suzhou intensive bus duct installation technicians can enter the site to determine the direction of the Suzhou intensive bus duct and measure its length on-site. The measurement process should pay attention to several points:
(1) Pay attention to the number and type of busbar reversing connectors;
(2) Ensure that the dense bus duct in Suzhou cannot be laid in parallel under the water supply pipeline and gas pipeline, and must be laid on the pipeline when it crosses the pipeline;
(3) The connection part of the two-stage unit Suzhou dense bus duct cannot be placed in the wall or floor. The branch point of the plug-in box should be considered when measuring. The socket should be installed in a safe and convenient place for maintenance. At the same time, the electrical The height of the shaft opening;
(4) When there are many floors in a high-rise building, consideration should be given to the transportation of the entire section of Suzhou dense busway in the building and how to enter the electrical shaft;
(5) The medicine laid in a small space or in the accessory cabinet should take into account the heat dissipation problem, and leave a certain amount of heat dissipation margin. After the measurement is completed, the length of each section of Suzhou intensive bus duct and the sequence of accessories will be numbered in detail, and then they can be handed over to the remanufacturer for manufacturing and processing.
3. Inspection of intensive bus duct in Suzhou
After the finished products of Suzhou intensive bus ducts arrive at the construction site, construction technicians must strictly inspect the Suzhou intensive bus ducts. The inspection content includes: inspection of the product factory certificate and installation technical documents. The technical indicators include rated capacity, rated voltage, test reports and other information; check the quality of Suzhou dense bus ducts. Including checking whether the casing of Suzhou dense bus duct is complete, whether the number of each section of Suzhou dense bus duct is clear, whether the casing is deformed, whether there is damage inside, whether the connecting surface of the bolted Suzhou dense bus duct joint is flat, and its galvanized layer Whether it is smooth, whether the connecting hole is symmetrical, whether the insulation board of the busbar is damaged or broken, and whether necessary water-proof, moisture-proof and dust-proof measures are taken during transportation. Check product accessories and accessories. Including checking whether the busbar machine parts are products processed by the manufacturer according to the design drawing after on-site measurement, and at the same time checking whether the quantity and specifications of each accessory meet the design requirements, and whether it is a galvanized product. Suzhou intensive bus ducts should also be subjected to segmented insulation testing before installation and construction. The Suzhou intensive bus duct that meets the above requirements can enter the installation site. The storage place of the Suzhou intensive bus duct on the construction site should be kept clean and waterproof and moisture-proof.
Welcome everyone to choose Jiangsu Xusheng Electric Complete Equipment Co., Ltd., the company specializes in the production, development and service of Suzhou intensive busway product technology. The company provides customers with safe and reliable Suzhou intensive busway products and services, which has solved the majority of customers. Worries for the future.